GPON GLASFASER GmbH

Book an installation appointment

Choose your preferred date. We check availability and confirm the appointment by phone or email.

Subsequent connection (Nachanschluss, NAS), house connection installation and activation: online booking for households in these towns

  • 51503 Rösrath
  • 53797 Lohmar
  • 67434 Neustadt an der Weinstraße
  • 67737 Olsbrücken
  • 72144 Dußlingen
  • 73275 Ohmden
  • 73277 Owen
  • 76351 Linkenheim-Hochstetten

Your town is not listed? Please write to us using the contact form. Contact →

What happens at your appointment

  1. 1

    Cable route through the garden

    The cable is brought from the property boundary to the agreed spot on the house wall – usually underground with a soil-displacement tool, so your garden stays intact.

  2. 2

    Building entry

    We drill through the wall at the agreed spot and seal the entry gas- and watertight.

  3. 3

    Handover point and fibre outlet

    The house handover point (HÜP) sits close to the building entry; the fibre outlet (GF-TA) goes where it was agreed during the site survey – usually in the living area.

  4. 4

    Testing and fibre modem

    We test the line and mount the fibre modem (NT) right next to the fibre outlet.

  5. 5

    Activation and sign-off

    We activate your connection, answer your questions and you confirm the work with your signature. You receive the report by email. After that you can connect your router.

Please prepare

FAQ →